top of page
Search

El Modena High School New 2022 Science Building

Mar 23, 2022
1 min read

Updated: Mar 25, 2022

This building was in construction since 2019 and it is finally finished on March 21, 2022. Almost 4 years of work and waiting, El Modena students can finally learn science in a new high tech building. I love how this new building looks and glad to study physics in a science building like this. What I like are the hallways look pretty, outside view is fantastic, classrooms are new and improved, and so much more. Total cost for this new science building came up to $40 million dollars with 43, 200 square feet. I glad to spend my final years of high school with this new building open, and glad that new students will spend their four years in this new building.


Front of the Building


  • Far Right Side
  • Left Stair Case
  • Far Left Side
  • Back of the Building Flowers
  • Upstairs View
  • Elevator
  • Front Campus
  • Right Stair Case
  • Full Building
  • Downstairs Lobby
  • 1st Floor Plants
  • 1st Floor View of Upstairs
  • Left Side plants and Stairs
  • 1st Floor Hallway
  • 2nd Floor Hallway
  • Outside Path
  • Classroom and Hallway
  • Front Lawn and Building
  • Left Side Plants and Flowers
  • Restroom

 
 
 

Comments


bottom of page